ConstructionOnline’s power, speed, and vision are made possible by UDA’s dedication to resolving client requests, enhancing existing features routinely, and introducing new tools often. This cycle’s publish includes -
SPEED & PERFORMANCE
- Optimized file load speeds, making load times 88% faster
ONPLAN™ SCHEDULING
- Added the ability to assign multiple Resources to a Schedule Task
- The “Assign Resource” window can be accessed by right-clicking on the desired Schedule Task or within the “Resources” tab of the Edit Task modal.
- Within the “Assign Resource” window, users can assign one or multiple Resources to their desired Schedule Task by marking the checkbox next to the desired Resource Name.
- The “Assign Resource” window also displays Resource Availability including any current and upcoming activities.
- Added the ability to add file attachments to Schedule Tasks
- Verified users can add Reminders in all instances
COMPANY PROJECTS
- Ensured users can duplicate Project Templates from the Project Templates table via right-click and three-dot action menus
TIME TRACKING
- Confirmed exporting Time Sheets to Excel is successful in all instances